diff options
author | Thomas Voss <mail@thomasvoss.com> | 2024-11-27 20:54:24 +0100 |
---|---|---|
committer | Thomas Voss <mail@thomasvoss.com> | 2024-11-27 20:54:24 +0100 |
commit | 4bfd864f10b68b71482b35c818559068ef8d5797 (patch) | |
tree | e3989f47a7994642eb325063d46e8f08ffa681dc /doc/rfc/rfc372.txt | |
parent | ea76e11061bda059ae9f9ad130a9895cc85607db (diff) |
doc: Add RFC documents
Diffstat (limited to 'doc/rfc/rfc372.txt')
-rw-r--r-- | doc/rfc/rfc372.txt | 218 |
1 files changed, 218 insertions, 0 deletions
diff --git a/doc/rfc/rfc372.txt b/doc/rfc/rfc372.txt new file mode 100644 index 0000000..a89ffac --- /dev/null +++ b/doc/rfc/rfc372.txt @@ -0,0 +1,218 @@ + + + + + + +NWG/RFC #372 Richard W. Watson +NIC 11022 (SRI-ARC) + 12-JUL-72 + +NOTES ON A CONVERSATION WITH BOB KAHN ON THE ICCC + +I called Bob Kahn and had a good chat with him about some aspects +of the ICCC meeting demonstration. The points discussed and his +answers were the following. + +What is the physical environment going to be like? + + Bob has arranged for the Georgetown Ballroom of the Hilton + Hotel; it has 3000 square feet probably about 75x40 (exact + dimensions are not known to Bob at this time). + + A carpeted false floor is to be installed and there will be + a partition for an area to show a movie on resource sharing + which will run more or less continuously. + + There will not be booths in the normal sense but details + are not yet worked out. Bob expects to have tables + arranged around the room holding 1 or 2 terminals and low 4 + ft. partitions to break up the space. + +Who will man the booths? + + Bob presently expects many terminals to be unmanned, + although manufcturers could have a sales rep. + + There will probably be people from net sites at some of + them from time to time to demonstrate their programs. + + We discussed the need for lots of experts from the network + around who can answer questions and help people. Bob is in + favor of such a thing but has not had time yet to pull such + a group together and there is some uncertainty if enough + people will volunteer, his initial approach to people + yielded lots of people interested but with other things to + do. + +When will the equipment be on the floor and available to try +there? + + + + + + + + + [Page 1] + +NWG/RFC# 372 RWW 12-JUL-72 9:39 11022 +Notes on a Conversation with Bob Kahn on the ICCC + +The conference is tues-thurs oct 24-26 and at the moment +the room is only going to be available from the 22nd. This +seems to be a short time to install floor, TIP, terminals, +phone lines, etc and Bob is going to try to get the room +the previous Wed or Fri, but doesn't know yet. + +Bob would like to have working demo with terminals, +resources at BBN in Aug. + +What resources are presently committed? + + UCLA Klinerock will have some network measurement stuff to + demonstrate. + + Stanford AI has indicated they will have some programs to + demone. + + Utah Tony Hearn will have his Reduce program to demo, Berry + Wessler plans to demo something, Harvey Greenfield has some + sort of mdical program. + + RAND before recent sakeup indicated iterest, status now not + known. + + SDC will have some natural language programs and their + data management systems. + + MIT Vezza and Kahn are looking into having some hardcopy + device such as Photon attached to a GE TS system. Al has + some other things to demo. + + Bob has contacted a number of non net sources such as the + NY Times (data base), Eastern Airlines etc., but has no + definite commitments yet. + + We at ARC will of course have a number of things to + demonstrate. + +This ARPANET demo is the only show at the conference. Larry +Roberts has invited the ASIS people over for Thurs afternoon. + + + + + + + + + [Page 2] + +NWG/RFC# 372 RWW 12-JUL-72 9:39 11022 +Notes on a Conversation with Bob Kahn on the ICCC + +The TIP has at this time never been tested with 64 terminals, +but they are going to be putting as many terminal on as +possible during July and testing the terminal to be supplied +ford the conference. + +Starting about AUg 1 he expects to start testing to see what +terminals work with what resources and what glitches exist. + +I asked Bob if we could have enough space for a ARC NIC booth +with an IMLAC TI and room for people to watch our demo's. Bob +saw no problem there; IMLAC has committed 2 terminals and we +can have one. TI has not indicated they plan to loan terminal +for the show. Hiram French is the man from IMLAC who is +supposed to call us. If there are more than 64 terminal or +the TIP can't support all, then they will have to schedule +terminal connections to the TIP. + +Bob is not sure who will be at the conference, its theme is +networks and their impact on soceity, implications for +regulation etc. so ther should be a broad spectrum of people; +will send me a program. + +We talked about what kind of documentation help, signs etc +will be around to help people connect and use resources and +generally understand wha the deomo is allabout. + + Bob's present picture is some large 2x3 signs in the lobby + outside the main lecture room directing people to the demo + and then some signs inside explaining what's happening, a + card with some TIP commands,resources, a brochure with + actual scenerios of resource usage, the movie and some + people as the main on the floor sources of help. + + We talked about the need to coordinate all this with NIC + documentation and our desire to help design all this. Bob + and I are tentatively planning to get together the weekend + of July 7 here to plan this. We need to have + thoughtcthrough ahead of time what we think should be done. + +ARPA except for Bob does not seem to have set up any budget for +this show except what their contractors are essentially willing +to give as part of their ongoing research, therefore he has a +very difficult job of pulling off such a large show without more +help than he seems to have gotten so far (these are my +conclusions not satements of his). + + + + [Page 3] + + [ This RFC was put into machine readable form for entry ] + [ into the online RFC archives by BBN Corp. under the ] + [ direction of Alex McKenzie. 1/97 ] + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + [Page 4] + |