summaryrefslogtreecommitdiff
path: root/doc/rfc/rfc416.txt
diff options
context:
space:
mode:
authorThomas Voss <mail@thomasvoss.com> 2024-11-27 20:54:24 +0100
committerThomas Voss <mail@thomasvoss.com> 2024-11-27 20:54:24 +0100
commit4bfd864f10b68b71482b35c818559068ef8d5797 (patch)
treee3989f47a7994642eb325063d46e8f08ffa681dc /doc/rfc/rfc416.txt
parentea76e11061bda059ae9f9ad130a9895cc85607db (diff)
doc: Add RFC documents
Diffstat (limited to 'doc/rfc/rfc416.txt')
-rw-r--r--doc/rfc/rfc416.txt111
1 files changed, 111 insertions, 0 deletions
diff --git a/doc/rfc/rfc416.txt b/doc/rfc/rfc416.txt
new file mode 100644
index 0000000..a4a93bc
--- /dev/null
+++ b/doc/rfc/rfc416.txt
@@ -0,0 +1,111 @@
+
+
+
+
+
+
+NETWORK WORKING GROUP James C. Norton (SRI-ARC)
+Request for Comments #416 7-NOV-72
+NIC #12542
+
+THE ARC SYSTEM WILL BE UNAVAILABLE FOR USE DURING THANKSGIVING WEEK
+
+The ARC PDP-10 system will be unavailable for ARC and NIC users
+from Friday, November 17 (6:00 pm PST ) through Sunday, November
+26. (10:00 pm PST). This will give our hardware team a period of
+nine days to work on equipment with a loss of only three SRI
+working days to users (Monday, Tuesday, and Wednesday.)
+
+This is the Network Information Center's notice to its network
+users of the schedule.
+
+ In addition, a login message will be sent starting about 6
+ November to all users showing schedule.
+
+ It will read something like: "THE ARC/NIC PDP-10 SYSTEM
+ WILL BE UNAVAILABLE FOR USE FROM FRIDAY NOV 17 (6:00 pm
+ PST) THRU SUNDAY NOV 26 (10:00 pm PST) FOR MAJOR HARDWARE
+ WORK AS OUTLINED IN (12542,)".
+
+For those who are interested, the hardware facility work to be
+done during this period will include:
+
+ Removal of the Bryant disk, Bryant disk controller and
+ Cybernex drum-disk interference.
+
+ Moving the Tasker display system and DEC dispack (old and
+ new) equipment to their new locations.
+
+ Having Bryant people run a combination drum maintenance and
+ training session to teach ARC people how to change heads and
+ clean the drum.
+
+ Redoing the power cabling to the drum.
+
+ Putting the new signal cable in between drum and controller.
+
+ Debugging the parity checker.
+
+
+
+
+
+
+
+
+
+
+ [Page 1]
+
+ Making a check of all main signal levels in XCORE.
+
+ Debugging the new cable from the parity checker to XCORE.
+
+ Wiring the parity bit through the Cybernex XCORE interface.
+
+ Getting any necessary power wiring done.
+
+ Building a wall for the next dispack location.
+
+