diff options
author | Thomas Voss <mail@thomasvoss.com> | 2024-11-27 20:54:24 +0100 |
---|---|---|
committer | Thomas Voss <mail@thomasvoss.com> | 2024-11-27 20:54:24 +0100 |
commit | 4bfd864f10b68b71482b35c818559068ef8d5797 (patch) | |
tree | e3989f47a7994642eb325063d46e8f08ffa681dc /doc/rfc/rfc476.txt | |
parent | ea76e11061bda059ae9f9ad130a9895cc85607db (diff) |
doc: Add RFC documents
Diffstat (limited to 'doc/rfc/rfc476.txt')
-rw-r--r-- | doc/rfc/rfc476.txt | 115 |
1 files changed, 115 insertions, 0 deletions
diff --git a/doc/rfc/rfc476.txt b/doc/rfc/rfc476.txt new file mode 100644 index 0000000..7cecfab --- /dev/null +++ b/doc/rfc/rfc476.txt @@ -0,0 +1,115 @@ + + + + + + +Network Working Group Alexander McKenzie +RFC # 476 BBN-NET +NIC # 14920 March 7, 1973 + + + IMP/TIP Memory Retrofit Schedule (Revision 2) + + +This revision contains two types of changes to RFC #447. First, the +retrofits to Utah, Belvoir, NOAA, USC, Stanford, ISI, Case, and CCA have +been completed and are therefore removed from the schedule. Second, the +retrofits to UCSB, ETAC, Aberdeen, and Rome have been rescheduled. + +The revised text of RFC #447 follows: + +During the first several months of 1973 we will be retrofitting each IMP +and TIP with additional core memory. At the end of the retrofit +program, the memory sizes of the various machines will be as follows: + + IMP (516 or 316) - 16K words + + TIP - 28K words + + TIP with Magnetic Tape Option - 32K words + +In addition, the expansion of the TIP core memory will necessitate +enlarging the TIP to two cabinets. + +Listed below is the schedule for the remaining retrofits. We have +arranged this schedule to coincide with the usual monthly Preventive +Maintenance at each site so as to minimize user inconvenience, but the +work required will frequently require the machines to be down longer +than normal. I will issue additional RFC's updating this schedule as +necessary. + +Any site which anticipates difficulty with the expansion of TIP size, +and thus the floor space requirement, should contact Hawley Rising (BBN) +at + (617)491-1850 ext. 473 +All dates given below are below in the form (month/day) + + SRI (3/7) + ETAC (3/15) + FNWC (3/15 + Rome (3/16) + UCLA (3/19) + AMES IMP (3/21) + GWC (3/22) + + + +McKenzie [Page 1] + +RFC 476 IMP/TIP Memory Retrofit Schedule (Rev 2) March 1973 + + + Carnegie (4/4) + SDC (4/17) + Illinois (4/18) + UCSB (5/1) + Aberdeen (postponed indefinitely) + + + + + + + + + + + [ This RFC was put into machine readable form for entry ] + [ into the online RFC archives by Alex McKenzie with ] + [ support from GTE, formerly BBN Corp. 9/99 ] + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +McKenzie [Page 2] + |