summaryrefslogtreecommitdiff
path: root/doc/rfc/rfc6201.txt
diff options
context:
space:
mode:
Diffstat (limited to 'doc/rfc/rfc6201.txt')
-rw-r--r--doc/rfc/rfc6201.txt955
1 files changed, 955 insertions, 0 deletions
diff --git a/doc/rfc/rfc6201.txt b/doc/rfc/rfc6201.txt
new file mode 100644
index 0000000..b2355eb
--- /dev/null
+++ b/doc/rfc/rfc6201.txt
@@ -0,0 +1,955 @@
+
+
+
+
+
+
+Internet Engineering Task Force (IETF) R. Asati
+Request for Comments: 6201 C. Pignataro
+Updates: 1242, 2544 F. Calabria
+Category: Informational Cisco
+ISSN: 2070-1721 C. Olvera
+ Consulintel
+ March 2011
+
+
+ Device Reset Characterization
+
+Abstract
+
+ An operational forwarding device may need to be restarted
+ (automatically or manually) for a variety of reasons, an event called
+ a "reset" in this document. Since there may be an interruption in
+ the forwarding operation during a reset, it is useful to know how
+ long a device takes to resume the forwarding operation.
+
+ This document specifies a methodology for characterizing reset (and
+ reset time) during benchmarking of forwarding devices and provides
+ clarity and consistency in reset test procedures beyond what is
+ specified in RFC 2544. Therefore, it updates RFC 2544. This
+ document also defines the benchmarking term "reset time" and, only in
+ this, updates RFC 1242.
+
+Status of This Memo
+
+ This document is not an Internet Standards Track specification; it is
+ published for informational purposes.
+
+ This document is a product of the Internet Engineering Task Force
+ (IETF). It represents the consensus of the IETF community. It has
+ received public review and has been approved for publication by the
+ Internet Engineering Steering Group (IESG). Not all documents
+ approved by the IESG are a candidate for any level of Internet
+ Standard; see Section 2 of RFC 5741.
+
+ Information about the current status of this document, any errata,
+ and how to provide feedback on it may be obtained at
+ http://www.rfc-editor.org/info/rfc6201.
+
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 1]
+
+RFC 6201 Reset Characterization March 2011
+
+
+Copyright Notice
+
+ Copyright (c) 2011 IETF Trust and the persons identified as the
+ document authors. All rights reserved.
+
+ This document is subject to BCP 78 and the IETF Trust's Legal
+ Provisions Relating to IETF Documents
+ (http://trustee.ietf.org/license-info) in effect on the date of
+ publication of this document. Please review these documents
+ carefully, as they describe your rights and restrictions with respect
+ to this document. Code Components extracted from this document must
+ include Simplified BSD License text as described in Section 4.e of
+ the Trust Legal Provisions and are provided without warranty as
+ described in the Simplified BSD License.
+
+Table of Contents
+
+ 1. Introduction ....................................................3
+ 1.1. Scope ......................................................3
+ 1.2. Reset Time .................................................4
+ 1.3. Reset Time Measurement Methods .............................5
+ 1.4. Reporting Format ...........................................6
+ 2. Key Words to Reflect Requirements ...............................7
+ 3. Test Requirements ...............................................7
+ 4. Reset Tests .....................................................8
+ 4.1. Hardware Reset Tests .......................................9
+ 4.1.1. Routing Processor (RP) / Routing Engine Reset .......9
+ 4.1.2. Line Card (LC) Removal and Insertion (REQUIRED) ....11
+ 4.2. Software Reset Tests ......................................12
+ 4.2.1. Operating System (OS) Reset (REQUIRED) .............12
+ 4.2.2. Process Reset (OPTIONAL) ...........................13
+ 4.3. Power Interruption Test ...................................14
+ 4.3.1. Power Interruption (REQUIRED) ......................14
+ 5. Security Considerations ........................................15
+ 6. Acknowledgments ................................................16
+ 7. References .....................................................16
+ 7.1. Normative References ......................................16
+ 7.2. Informative References ....................................16
+
+
+
+
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 2]
+
+RFC 6201 Reset Characterization March 2011
+
+
+1. Introduction
+
+ An operational forwarding device (or one of its components) may need
+ to be restarted for a variety of reasons, an event called a "reset"
+ in this document. Since there may be an interruption in the
+ forwarding operation during a reset, it is useful to know how long a
+ device takes to resume the forwarding operation. In other words, the
+ duration of the recovery time following the reset (see Section 1.2,
+ "Reset Time") is what is in question.
+
+ However, the answer to this question is no longer simple and
+ straightforward as the modern forwarding devices employ many hardware
+ advancements (distributed forwarding, etc.) and software advancements
+ (graceful restart, etc.) that influence the recovery time after the
+ reset.
+
+1.1. Scope
+
+ This document specifies a methodology for characterizing reset (and
+ reset time) during benchmarking of forwarding devices and provides
+ clarity and consistency in reset procedures beyond what is specified
+ in [RFC2544]. Software upgrades involve additional benchmarking
+ complexities and are outside the scope of this document.
+
+ These procedures may be used by other benchmarking documents such as
+ [RFC2544], [RFC5180], [RFC5695], etc., and it is expected that other
+ protocol-specific benchmarking documents will reference this document
+ for reset recovery time characterization. Specific Routing
+ Information Base (RIB) and Forwarding Information Base (FIB) scaling
+ considerations are outside the scope of this document and can be
+ quite complex to characterize. However, other documents can
+ characterize specific dynamic protocols' scaling and interactions as
+ well as leverage and augment the reset tests defined in this
+ document.
+
+ This document updates Section 26.6 of [RFC2544] and defines the
+ benchmarking term "reset time", updating [RFC1242].
+
+ This document focuses only on the reset criterion of benchmarking and
+ presumes that it would be beneficial to [RFC5180], [RFC5695], and
+ other IETF Benchmarking Methodology Working Group (BMWG) efforts.
+
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 3]
+
+RFC 6201 Reset Characterization March 2011
+
+
+1.2. Reset Time
+
+ Definition
+
+ Reset time is the total time that a device is determined to be out
+ of operation and includes the time to perform the reset and the
+ time to recover from it.
+
+ Discussion
+
+ During a period of time after a reset or power up, network devices
+ may not accept and forward frames. The duration of this period of
+ forwarding unavailability can be useful in evaluating devices. In
+ addition, some network devices require some form of reset when
+ specific setup variables are modified. If the reset period were
+ long, it might discourage network managers from modifying these
+ variables on production networks.
+
+ The events characterized in this document are entire reset events.
+ That is, the recovery period measured includes the time to perform
+ the reset and the time to recover from it. Some reset events will
+ be atomic (such as pressing a reset button) while others (such as
+ power cycling) may comprise multiple actions with a recognized
+ interval between them. In both cases, the duration considered is
+ from the start of the event until full recovery of forwarding
+ after the completion of the reset events.
+
+ Measurement Units
+
+ Time, in milliseconds, providing sufficient resolution to
+ distinguish between different trials and different
+ implementations. See Section 1.4.
+
+ Issues
+
+ There are various types of resets: hardware resets, software
+ resets, and power interruptions. See Section 4.
+
+ See Also
+
+ This definition updates [RFC1242].
+
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 4]
+
+RFC 6201 Reset Characterization March 2011
+
+
+1.3. Reset Time Measurement Methods
+
+ The reset time is the time during which traffic forwarding is
+ temporarily interrupted following a reset event. Strictly speaking,
+ this is the time over which one or more frames are lost. This
+ definition is similar to that of "Loss of Connectivity Period"
+ defined in [IGPConv], Section 4.
+
+ There are two accepted methods to measure the reset time:
+
+ 1. Frame-Loss Method - This method requires test tool capability to
+ monitor the number of lost frames. In this method, the offered
+ stream rate (frames per second) must be known. The reset time is
+ calculated per the equation below:
+
+ Frames_lost (packets)
+ Reset_time = -------------------------------------
+ Offered_rate (packets per second)
+
+ 2. Timestamp Method - This method requires test tool capability to
+ timestamp each frame. In this method, the test tool timestamps
+ each transmitted frame and monitors the received frame's
+ timestamp. During the test, the test tool records the timestamp
+ (Timestamp A) of the frame that was last received prior to the
+ reset interruption and the timestamp of the first frame after the
+ interruption stopped (Timestamp B). The difference between
+ Timestamp B and Timestamp A is the reset time.
+
+ The tester/operator MAY use either method for reset time measurement
+ depending on the test tool capability. However, the Frame-Loss
+ method SHOULD be used if the test tool is capable of (a) counting the
+ number of lost frames per stream and (b) transmitting test frame
+ despite the physical link status, whereas the Timestamp method SHOULD
+ be used if the test tool is capable of (a) timestamping each frame,
+ (b) monitoring received frame's timestamp, and (c) transmitting
+ frames only if the physical link status is UP. That is, specific
+ test tool capabilities may dictate which method to use. If the test
+ tool supports both methods based on its capabilities, the
+ tester/operator SHOULD use the one that provides more accuracy.
+
+
+
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 5]
+
+RFC 6201 Reset Characterization March 2011
+
+
+1.4. Reporting Format
+
+ All reset results are reported in a simple statement including the
+ frame loss (if measured) and reset times.
+
+ For each test case, it is RECOMMENDED that the following parameters
+ be reported in these units:
+
+ Parameter Units or Examples
+ ---------------------------------------------------------------
+
+ Throughput Frames per second and bits per
+ second
+
+ Loss (average) Frames
+
+ Reset Time (average) Milliseconds
+
+ Number of trials Integer count
+
+ Protocol IPv4, IPv6, MPLS, etc.
+
+ Frame Size Octets
+
+ Port Media Ethernet, Gigabit Ethernet (GbE),
+ Packet over SONET (POS), etc.
+
+ Port Speed 10 Gbps, 1 Gbps, 100 Mbps, etc.
+
+ Interface Encap. Ethernet, Ethernet VLAN,
+ PPP, High-Level Data Link Control
+ (HDLC), etc.
+
+ For mixed protocol environments, frames SHOULD be distributed between
+ all the different protocols. The distribution MAY approximate the
+ network conditions of deployment. In all cases, the details of the
+ mixed protocol distribution MUST be included in the reporting.
+
+ Additionally, the DUT (Device Under Test) or SUT (System Under Test)
+ and test bed provisioning, port and line-card arrangement,
+ configuration, and deployed methodologies that may influence the
+ overall reset time MUST be listed. (Refer to the additional factors
+ listed in Section 3).
+
+ The reporting of results MUST regard repeatability considerations
+ from Section 4 of [RFC2544]. It is RECOMMENDED to perform multiple
+ trials and report average results.
+
+
+
+
+Asati, et al. Informational [Page 6]
+
+RFC 6201 Reset Characterization March 2011
+
+
+2. Key Words to Reflect Requirements
+
+ The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT",
+ "SHOULD", "SHOULD NOT", "RECOMMENDED", "MAY", and "OPTIONAL" in this
+ document are to be interpreted as described in BCP 14, RFC 2119
+ [RFC2119]. RFC 2119 defines the use of these key words to help make
+ the intent of Standards-Track documents as clear as possible. While
+ this document uses these keywords, this document is not a Standards-
+ Track document.
+
+3. Test Requirements
+
+ Tests SHOULD first be performed such that the forwarding state
+ re-establishment is independent from an external source (i.e., using
+ static address resolution, routing and forwarding configuration, and
+ not dynamic protocols). However, tests MAY subsequently be performed
+ using dynamic protocols that the forwarding state depends on (e.g.,
+ dynamic Interior Gateway Protocols (IGP), Address Resolution Protocol
+ (ARP), PPP Control Protocols, etc.). The considerations in this
+ section apply.
+
+ In order to provide consistence and fairness while benchmarking a set
+ of different DUTs, the Network tester/operator MUST (a) use identical
+ control and data plane information during testing and (b) document
+ and report any factors that may influence the overall time after
+ reset/convergence.
+
+ Some of these factors include the following:
+
+ 1. Type of reset - hardware (line-card crash, etc.) versus software
+ (protocol reset, process crash, etc.) or even complete power
+ failures
+
+ 2. Manual versus automatic reset
+
+ 3. Scheduled versus non-scheduled reset
+
+ 4. Local versus remote reset
+
+ 5. Scale - Number of line cards present versus in use
+
+ 6. Scale - Number of physical and logical interfaces
+
+ 7. Scale - Number of routing protocol instances
+
+ 8. Scale - Number of routing table entries
+
+ 9. Scale - Number of route processors available
+
+
+
+Asati, et al. Informational [Page 7]
+
+RFC 6201 Reset Characterization March 2011
+
+
+ 10. Performance - Redundancy strategy deployed for route processors
+ and line cards
+
+ 11. Performance - Interface encapsulation as well as achievable
+ throughput [RFC2544]
+
+ 12. Any other internal or external factor that may influence reset
+ time after a hardware or software reset
+
+ The reset time is one of the key characterization results reported
+ after each test run. While the reset time during a reset test event
+ may be zero, there may still be effects on traffic, such as transient
+ delay variation or increased latency. However, that is not covered
+ and is deemed outside the scope of this document. In this case, only
+ "no loss" is reported.
+
+4. Reset Tests
+
+ This section contains descriptions of the tests that are related to
+ the characterization of the time needed for DUTs (Devices Under Test)
+ or SUTs (Systems Under Test) to recover from a reset. There are
+ three types of resets considered in this document:
+
+ 1. Hardware resets
+
+ 2. Software resets
+
+ 3. Power interruption
+
+ Different types of resets potentially have a different impact on the
+ forwarding behavior of the device. As an example, a software reset
+ (of a routing process) might not result in forwarding interruption,
+ whereas a hardware reset (of a line card) most likely will.
+
+ Section 4.1 describes various hardware resets, whereas Section 4.2
+ describes various software resets. Additionally, Section 4.3
+ describes power interruption tests. These sections define and
+ characterize these resets.
+
+ Additionally, since device-specific implementations may vary for
+ hardware and software type resets, it is desirable to classify each
+ test case as "REQUIRED" or "OPTIONAL".
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 8]
+
+RFC 6201 Reset Characterization March 2011
+
+
+4.1. Hardware Reset Tests
+
+ A hardware reset test is a test designed to characterize the time it
+ takes a DUT to recover from a hardware reset.
+
+ A hardware reset generally involves the re-initialization of one or
+ more physical components in the DUT, but not the entire DUT.
+
+ A hardware reset is executed by the operator, for example, by
+ physical removal of a hardware component, by pressing a reset button
+ for the component, or by being triggered from the command line
+ interface (CLI).
+
+ Reset procedures that do not require the physical removal and
+ insertion of a hardware component are RECOMMENDED. These include
+ using the command line interface (CLI) or a physical switch or
+ button. If such procedures cannot be performed (e.g., because of a
+ lack of platform support or because the corresponding test case calls
+ for them), human operation time SHOULD be minimized across different
+ platforms and test cases as much as possible, and variation in human
+ operator time SHOULD also be minimized across different vendors'
+ products as much as practical by having the same person perform the
+ operation and by practicing the operation. Additionally, the time
+ between removal and insertion SHOULD be recorded and reported.
+
+ For routers that do not contain separate Routing Processor and Line
+ Card modules, the hardware reset tests are not performed since they
+ are not relevant; instead, the power interruption tests MUST be
+ performed (see Section 4.3) in these cases.
+
+4.1.1. Routing Processor (RP) / Routing Engine Reset
+
+ The Routing Processor (RP) is the DUT module that is primarily
+ concerned with Control Plane functions.
+
+4.1.1.1. RP Reset for a Single-RP Device (REQUIRED)
+
+ Objective
+
+ To characterize the time needed for a DUT to recover from a Route
+ Processor hardware reset in a single RP environment.
+
+ Procedure
+
+ First, ensure that the RP is in a permanent state to which it will
+ return after the reset by performing some or all of the following
+ operational tasks: save the current DUT configuration, specify
+
+
+
+
+Asati, et al. Informational [Page 9]
+
+RFC 6201 Reset Characterization March 2011
+
+
+ boot parameters, ensure the appropriate software files are
+ available, or perform additional operating system or hardware-
+ related tasks.
+
+ Second, ensure that the DUT is able to forward the traffic for at
+ least 15 seconds before any test activities are performed. The
+ traffic should use the minimum frame size possible on the media
+ used in the testing, and the rate should be sufficient for the DUT
+ to attain the maximum forwarding throughput. This enables a finer
+ granularity in the reset time measurement.
+
+ Third, perform the Route Processor (RP) hardware reset at this
+ point. This entails, for example, physically removing the RP to
+ later re-insert it or triggering a hardware reset by other means
+ (e.g., command line interface, physical switch, etc.).
+
+ Finally, complete the characterization by recording the frame loss
+ or timestamps (as reported by the test tool) and calculating the
+ reset time (as defined in Section 1.3).
+
+ Reporting Format
+
+ The reporting format is defined in Section 1.4.
+
+4.1.1.2. RP Switchover for a Multiple-RP Device (OPTIONAL)
+
+ Objective
+
+ To characterize the time needed for the "secondary" Route
+ Processor (sometimes referred to as the "backup" RP) of a DUT to
+ become active after a "primary" (or "active") Route Processor
+ hardware reset. This process is often referred to as "RP
+ Switchover". The characterization in this test should be done for
+ the default DUT behavior and, if it exists, for the DUT's non-
+ default configuration that minimizes frame loss.
+
+ Procedure
+
+ This test characterizes RP Switchover. Many implementations allow
+ for optimized switchover capabilities that minimize the downtime
+ during the actual switchover. This test consists of two sub-cases
+ from a switchover characteristic's standpoint: first, a default
+ behavior (with no switchover-specific configurations) and,
+ potentially second, a non-default behavior with switchover
+ configuration to minimize frame loss. Therefore, the procedures
+ hereby described are executed twice and reported separately.
+
+
+
+
+
+Asati, et al. Informational [Page 10]
+
+RFC 6201 Reset Characterization March 2011
+
+
+ First, ensure that the RPs are in a permanent state such that the
+ secondary RP will be activated to the same state as the active RP
+ by performing some or all of the following operational tasks: save
+ the current DUT configuration, specify boot parameters, ensure the
+ appropriate software files are available, or perform additional
+ operating system or hardware-related tasks.
+
+ Second, ensure that the DUT is able to forward the traffic for at
+ least 15 seconds before any test activities are performed. The
+ traffic should use the minimum frame size possible on the media
+ used in the testing, and the rate should be sufficient for the DUT
+ to attain the maximum forwarding throughput. This enables a finer
+ granularity in the reset time measurement.
+
+ Third, perform the primary Route Processor (RP) hardware reset at
+ this point. This entails, for example, physically removing the RP
+ or triggering a hardware reset by other means (e.g., command line
+ interface, physical switch, etc.). It is up to the operator to
+ decide whether or not the primary RP needs to be re-inserted after
+ a grace period.
+
+ Finally, complete the characterization by recording the frame loss
+ or timestamps (as reported by the test tool) and calculating the
+ reset time (as defined in Section 1.3).
+
+ Reporting Format
+
+ The reset results are potentially reported twice, one for the
+ default switchover behavior (i.e., the DUT without any switchover-
+ specific enhanced configuration) and the other for the switchover-
+ specific behavior if it exists (i.e., the DUT configured for
+ optimized switchover capabilities that minimize the downtime
+ during the actual switchover).
+
+ The reporting format is defined in Section 1.4 and also includes
+ any specific redundancy scheme in place.
+
+4.1.2. Line Card (LC) Removal and Insertion (REQUIRED)
+
+ The Line Card (LC) is the DUT component that is responsible for
+ packet forwarding.
+
+ Objective
+
+ To characterize the time needed for a DUT to recover from a line-
+ card removal and insertion event.
+
+
+
+
+
+Asati, et al. Informational [Page 11]
+
+RFC 6201 Reset Characterization March 2011
+
+
+ Procedure
+
+ For this test, the line card that is being hardware-reset MUST be
+ on the forwarding path, and all destinations MUST be directly
+ connected.
+
+ First, complete some or all of the following operational tasks:
+ save the current DUT configuration, specify boot parameters,
+ ensure the appropriate software files are available, or perform
+ additional operating system or hardware-related tasks.
+
+ Second, ensure that the DUT is able to forward the traffic for at
+ least 15 seconds before any test activities are performed. The
+ traffic should use the minimum frame size possible on the media
+ used in the testing, and the rate should be sufficient for the DUT
+ to attain the maximum forwarding throughput. This enables a finer
+ granularity in the reset time measurement.
+
+ Third, perform the Line Card (LC) hardware reset at this point.
+ This entails, for example, physically removing the LC to later re-
+ insert it or triggering a hardware reset by other means (e.g.,
+ CLI, physical switch, etc.).
+
+ Finally, complete the characterization by recording the frame loss
+ or timestamps (as reported by the test tool) and calculating the
+ reset time (as defined in Section 1.3).
+
+ Reporting Format
+
+ The reporting format is defined in Section 1.4.
+
+4.2. Software Reset Tests
+
+ A software reset test characterizes the time needed for a DUT to
+ recover from a software reset.
+
+ In contrast to a hardware reset, a software reset involves only the
+ re-initialization of the execution, data structures, and partial
+ state within the software running on the DUT module(s).
+
+ A software reset is initiated, for example, from the DUT's CLI.
+
+4.2.1. Operating System (OS) Reset (REQUIRED)
+
+ Objective
+
+ To characterize the time needed for a DUT to recover from an
+ operating system (OS) software reset.
+
+
+
+Asati, et al. Informational [Page 12]
+
+RFC 6201 Reset Characterization March 2011
+
+
+ Procedure
+
+ First, complete some or all of the following operational tasks:
+ save the current DUT configuration, specify software boot
+ parameters, ensure the appropriate software files are available,
+ or perform additional operating system tasks.
+
+ Second, ensure that the DUT is able to forward the traffic for at
+ least 15 seconds before any test activities are performed. The
+ traffic should use the minimum frame size possible on the media
+ used in the testing, and the rate should be sufficient for the DUT
+ to attain the maximum forwarding throughput. This enables a finer
+ granularity in the reset time measurement.
+
+ Third, trigger an operating system re-initialization in the DUT by
+ operational means such as use of the DUT's CLI or other management
+ interface.
+
+ Finally, complete the characterization by recording the frame loss
+ or timestamps (as reported by the test tool) and calculating the
+ reset time (as defined in Section 1.3).
+
+ Reporting Format
+
+ The reporting format is defined in Section 1.4.
+
+4.2.2. Process Reset (OPTIONAL)
+
+ Objective
+
+ To characterize the time needed for a DUT to recover from a
+ software process reset.
+
+ Such a time period may depend upon the number and types of
+ processes running in the DUT and which ones are tested. Different
+ implementations of forwarding devices include various common
+ processes. A process reset should be performed only in the
+ processes most relevant to the tester and most impactful to
+ forwarding.
+
+ Procedure
+
+ First, complete some or all of the following operational tasks:
+ save the current DUT configuration, specify software parameters or
+ environmental variables, or perform additional operating system
+ tasks.
+
+
+
+
+
+Asati, et al. Informational [Page 13]
+
+RFC 6201 Reset Characterization March 2011
+
+
+ Second, ensure that the DUT is able to forward the traffic for at
+ least 15 seconds before any test activities are performed. The
+ traffic should use the minimum frame size possible on the media
+ used in the testing, and the rate should be sufficient for the DUT
+ to attain the maximum forwarding throughput. This enables a finer
+ granularity in the reset time measurement.
+
+ Third, trigger a process reset for each process running in the DUT
+ and considered for testing from a management interface (e.g., by
+ means of the CLI, etc.).
+
+ Finally, complete the characterization by recording the frame loss
+ or timestamps (as reported by the test tool) and calculating the
+ reset time (as defined in Section 1.3).
+
+ Reporting Format
+
+ The reporting format is defined in Section 1.4 and is used for
+ each process running in the DUT and tested. Given the
+ implementation nature of this test, details of the actual process
+ tested should be included along with the statement.
+
+4.3. Power Interruption Test
+
+ "Power interruption" refers to the complete loss of power on the DUT.
+ It can be viewed as a special case of a hardware reset, triggered by
+ the loss of the power supply to the DUT or its components, and is
+ characterized by the re-initialization of all hardware and software
+ in the DUT.
+
+4.3.1. Power Interruption (REQUIRED)
+
+ Objective
+
+ To characterize the time needed for a DUT to recover from a
+ complete loss of electric power or complete power interruption.
+ This test simulates a complete power failure or outage and should
+ be indicative of the DUT/SUT's behavior during such event.
+
+ Procedure
+
+ First, ensure that the entire DUT is at a permanent state to which
+ it will return after the power interruption by performing some or
+ all of the following operational tasks: save the current DUT
+ configuration, specify boot parameters, ensure the appropriate
+ software files are available, or perform additional operating
+ system or hardware-related tasks.
+
+
+
+
+Asati, et al. Informational [Page 14]
+
+RFC 6201 Reset Characterization March 2011
+
+
+ Second, ensure that the DUT is able to forward the traffic for at
+ least 15 seconds before any test activities are performed. The
+ traffic should use the minimum frame size possible on the media
+ used in the testing, and the rate should be sufficient for the DUT
+ to attain the maximum forwarding throughput. This enables a finer
+ granularity in the reset time measurement.
+
+ Third, interrupt the power (AC or DC) that feeds the corresponding
+ DUT's power supplies at this point. This entails, for example,
+ physically removing the power supplies in the DUT to later re-
+ insert them or simply disconnecting or switching off their power
+ feeds (AC or DC, as applicable). The actual power interruption
+ should last at least 15 seconds.
+
+ Finally, complete the characterization by recording the frame loss
+ or timestamps (as reported by the test tool) and calculating the
+ reset time (as defined in Section 1.3).
+
+ For easier comparison with other testing, 15 seconds are removed
+ from the reported reset time.
+
+ Reporting Format
+
+ The reporting format is defined in Section 1.4.
+
+5. Security Considerations
+
+ Benchmarking activities, as described in this document, are limited
+ to technology characterization using controlled stimuli in a
+ laboratory environment, with dedicated address space and the
+ constraints specified in the sections above.
+
+ The benchmarking network topology will be an independent test setup
+ and MUST NOT be connected to devices that may forward the test
+ traffic into a production network or misroute traffic to the test
+ management network.
+
+ Furthermore, benchmarking is performed on a "black-box" basis,
+ relying solely on measurements observable externally to the DUT/SUT.
+
+ Special capabilities SHOULD NOT exist in the DUT/SUT specifically for
+ benchmarking purposes. Any implications for network security arising
+ from the DUT/SUT SHOULD be identical in the lab and in production
+ networks.
+
+ There are no specific security considerations within the scope of
+ this document.
+
+
+
+
+Asati, et al. Informational [Page 15]
+
+RFC 6201 Reset Characterization March 2011
+
+
+6. Acknowledgments
+
+ The authors would like to thank Ron Bonica, who motivated us to write
+ this document. The authors would also like to thank Al Morton,
+ Andrew Yourtchenko, David Newman, John E. Dawson, Timmons C. Player,
+ Jan Novak, Steve Maxwell, Ilya Varlashkin, and Sarah Banks for
+ providing thorough review, useful suggestions, and valuable input.
+
+7. References
+
+7.1. Normative References
+
+ [RFC1242] Bradner, S., "Benchmarking Terminology for Network
+ Interconnection Devices", RFC 1242, July 1991.
+
+ [RFC2119] Bradner, S., "Key words for use in RFCs to Indicate
+ Requirement Levels", BCP 14, RFC 2119, March 1997.
+
+ [RFC2544] Bradner, S. and J. McQuaid, "Benchmarking Methodology for
+ Network Interconnect Devices", RFC 2544, March 1999.
+
+7.2. Informative References
+
+ [IGPConv] Poretsky, S., Imhoff, B., and K. Michielsen, "Benchmarking
+ Methodology for Link-State IGP Data Plane Route
+ Convergence", Work in Progress, February 2011.
+
+ [RFC5180] Popoviciu, C., Hamza, A., Van de Velde, G., and D.
+ Dugatkin, "IPv6 Benchmarking Methodology for Network
+ Interconnect Devices", RFC 5180, May 2008.
+
+ [RFC5695] Akhter, A., Asati, R., and C. Pignataro, "MPLS Forwarding
+ Benchmarking Methodology for IP Flows", RFC 5695, November
+ 2009.
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 16]
+
+RFC 6201 Reset Characterization March 2011
+
+
+Authors' Addresses
+
+ Rajiv Asati
+ Cisco Systems
+ 7025-6 Kit Creek Road
+ Research Triangle Park, NC 27709
+ USA
+
+ EMail: rajiva@cisco.com
+
+
+ Carlos Pignataro
+ Cisco Systems
+ 7200-12 Kit Creek Road
+ Research Triangle Park, NC 27709
+ USA
+
+ EMail: cpignata@cisco.com
+
+
+ Fernando Calabria
+ Cisco Systems
+ 7200-12 Kit Creek Road
+ Research Triangle Park, NC 27709
+ USA
+
+ EMail: fcalabri@cisco.com
+
+
+ Cesar Olvera Morales
+ Consulintel
+ Joaquin Turina, 2
+ Pozuelo de Alarcon, Madrid, E-28224
+ Spain
+
+ EMail: cesar.olvera@consulintel.es
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+Asati, et al. Informational [Page 17]
+