diff options
Diffstat (limited to 'doc/rfc/rfc6201.txt')
-rw-r--r-- | doc/rfc/rfc6201.txt | 955 |
1 files changed, 955 insertions, 0 deletions
diff --git a/doc/rfc/rfc6201.txt b/doc/rfc/rfc6201.txt new file mode 100644 index 0000000..b2355eb --- /dev/null +++ b/doc/rfc/rfc6201.txt @@ -0,0 +1,955 @@ + + + + + + +Internet Engineering Task Force (IETF) R. Asati +Request for Comments: 6201 C. Pignataro +Updates: 1242, 2544 F. Calabria +Category: Informational Cisco +ISSN: 2070-1721 C. Olvera + Consulintel + March 2011 + + + Device Reset Characterization + +Abstract + + An operational forwarding device may need to be restarted + (automatically or manually) for a variety of reasons, an event called + a "reset" in this document. Since there may be an interruption in + the forwarding operation during a reset, it is useful to know how + long a device takes to resume the forwarding operation. + + This document specifies a methodology for characterizing reset (and + reset time) during benchmarking of forwarding devices and provides + clarity and consistency in reset test procedures beyond what is + specified in RFC 2544. Therefore, it updates RFC 2544. This + document also defines the benchmarking term "reset time" and, only in + this, updates RFC 1242. + +Status of This Memo + + This document is not an Internet Standards Track specification; it is + published for informational purposes. + + This document is a product of the Internet Engineering Task Force + (IETF). It represents the consensus of the IETF community. It has + received public review and has been approved for publication by the + Internet Engineering Steering Group (IESG). Not all documents + approved by the IESG are a candidate for any level of Internet + Standard; see Section 2 of RFC 5741. + + Information about the current status of this document, any errata, + and how to provide feedback on it may be obtained at + http://www.rfc-editor.org/info/rfc6201. + + + + + + + + + + +Asati, et al. Informational [Page 1] + +RFC 6201 Reset Characterization March 2011 + + +Copyright Notice + + Copyright (c) 2011 IETF Trust and the persons identified as the + document authors. All rights reserved. + + This document is subject to BCP 78 and the IETF Trust's Legal + Provisions Relating to IETF Documents + (http://trustee.ietf.org/license-info) in effect on the date of + publication of this document. Please review these documents + carefully, as they describe your rights and restrictions with respect + to this document. Code Components extracted from this document must + include Simplified BSD License text as described in Section 4.e of + the Trust Legal Provisions and are provided without warranty as + described in the Simplified BSD License. + +Table of Contents + + 1. Introduction ....................................................3 + 1.1. Scope ......................................................3 + 1.2. Reset Time .................................................4 + 1.3. Reset Time Measurement Methods .............................5 + 1.4. Reporting Format ...........................................6 + 2. Key Words to Reflect Requirements ...............................7 + 3. Test Requirements ...............................................7 + 4. Reset Tests .....................................................8 + 4.1. Hardware Reset Tests .......................................9 + 4.1.1. Routing Processor (RP) / Routing Engine Reset .......9 + 4.1.2. Line Card (LC) Removal and Insertion (REQUIRED) ....11 + 4.2. Software Reset Tests ......................................12 + 4.2.1. Operating System (OS) Reset (REQUIRED) .............12 + 4.2.2. Process Reset (OPTIONAL) ...........................13 + 4.3. Power Interruption Test ...................................14 + 4.3.1. Power Interruption (REQUIRED) ......................14 + 5. Security Considerations ........................................15 + 6. Acknowledgments ................................................16 + 7. References .....................................................16 + 7.1. Normative References ......................................16 + 7.2. Informative References ....................................16 + + + + + + + + + + + + + +Asati, et al. Informational [Page 2] + +RFC 6201 Reset Characterization March 2011 + + +1. Introduction + + An operational forwarding device (or one of its components) may need + to be restarted for a variety of reasons, an event called a "reset" + in this document. Since there may be an interruption in the + forwarding operation during a reset, it is useful to know how long a + device takes to resume the forwarding operation. In other words, the + duration of the recovery time following the reset (see Section 1.2, + "Reset Time") is what is in question. + + However, the answer to this question is no longer simple and + straightforward as the modern forwarding devices employ many hardware + advancements (distributed forwarding, etc.) and software advancements + (graceful restart, etc.) that influence the recovery time after the + reset. + +1.1. Scope + + This document specifies a methodology for characterizing reset (and + reset time) during benchmarking of forwarding devices and provides + clarity and consistency in reset procedures beyond what is specified + in [RFC2544]. Software upgrades involve additional benchmarking + complexities and are outside the scope of this document. + + These procedures may be used by other benchmarking documents such as + [RFC2544], [RFC5180], [RFC5695], etc., and it is expected that other + protocol-specific benchmarking documents will reference this document + for reset recovery time characterization. Specific Routing + Information Base (RIB) and Forwarding Information Base (FIB) scaling + considerations are outside the scope of this document and can be + quite complex to characterize. However, other documents can + characterize specific dynamic protocols' scaling and interactions as + well as leverage and augment the reset tests defined in this + document. + + This document updates Section 26.6 of [RFC2544] and defines the + benchmarking term "reset time", updating [RFC1242]. + + This document focuses only on the reset criterion of benchmarking and + presumes that it would be beneficial to [RFC5180], [RFC5695], and + other IETF Benchmarking Methodology Working Group (BMWG) efforts. + + + + + + + + + + +Asati, et al. Informational [Page 3] + +RFC 6201 Reset Characterization March 2011 + + +1.2. Reset Time + + Definition + + Reset time is the total time that a device is determined to be out + of operation and includes the time to perform the reset and the + time to recover from it. + + Discussion + + During a period of time after a reset or power up, network devices + may not accept and forward frames. The duration of this period of + forwarding unavailability can be useful in evaluating devices. In + addition, some network devices require some form of reset when + specific setup variables are modified. If the reset period were + long, it might discourage network managers from modifying these + variables on production networks. + + The events characterized in this document are entire reset events. + That is, the recovery period measured includes the time to perform + the reset and the time to recover from it. Some reset events will + be atomic (such as pressing a reset button) while others (such as + power cycling) may comprise multiple actions with a recognized + interval between them. In both cases, the duration considered is + from the start of the event until full recovery of forwarding + after the completion of the reset events. + + Measurement Units + + Time, in milliseconds, providing sufficient resolution to + distinguish between different trials and different + implementations. See Section 1.4. + + Issues + + There are various types of resets: hardware resets, software + resets, and power interruptions. See Section 4. + + See Also + + This definition updates [RFC1242]. + + + + + + + + + + +Asati, et al. Informational [Page 4] + +RFC 6201 Reset Characterization March 2011 + + +1.3. Reset Time Measurement Methods + + The reset time is the time during which traffic forwarding is + temporarily interrupted following a reset event. Strictly speaking, + this is the time over which one or more frames are lost. This + definition is similar to that of "Loss of Connectivity Period" + defined in [IGPConv], Section 4. + + There are two accepted methods to measure the reset time: + + 1. Frame-Loss Method - This method requires test tool capability to + monitor the number of lost frames. In this method, the offered + stream rate (frames per second) must be known. The reset time is + calculated per the equation below: + + Frames_lost (packets) + Reset_time = ------------------------------------- + Offered_rate (packets per second) + + 2. Timestamp Method - This method requires test tool capability to + timestamp each frame. In this method, the test tool timestamps + each transmitted frame and monitors the received frame's + timestamp. During the test, the test tool records the timestamp + (Timestamp A) of the frame that was last received prior to the + reset interruption and the timestamp of the first frame after the + interruption stopped (Timestamp B). The difference between + Timestamp B and Timestamp A is the reset time. + + The tester/operator MAY use either method for reset time measurement + depending on the test tool capability. However, the Frame-Loss + method SHOULD be used if the test tool is capable of (a) counting the + number of lost frames per stream and (b) transmitting test frame + despite the physical link status, whereas the Timestamp method SHOULD + be used if the test tool is capable of (a) timestamping each frame, + (b) monitoring received frame's timestamp, and (c) transmitting + frames only if the physical link status is UP. That is, specific + test tool capabilities may dictate which method to use. If the test + tool supports both methods based on its capabilities, the + tester/operator SHOULD use the one that provides more accuracy. + + + + + + + + + + + + +Asati, et al. Informational [Page 5] + +RFC 6201 Reset Characterization March 2011 + + +1.4. Reporting Format + + All reset results are reported in a simple statement including the + frame loss (if measured) and reset times. + + For each test case, it is RECOMMENDED that the following parameters + be reported in these units: + + Parameter Units or Examples + --------------------------------------------------------------- + + Throughput Frames per second and bits per + second + + Loss (average) Frames + + Reset Time (average) Milliseconds + + Number of trials Integer count + + Protocol IPv4, IPv6, MPLS, etc. + + Frame Size Octets + + Port Media Ethernet, Gigabit Ethernet (GbE), + Packet over SONET (POS), etc. + + Port Speed 10 Gbps, 1 Gbps, 100 Mbps, etc. + + Interface Encap. Ethernet, Ethernet VLAN, + PPP, High-Level Data Link Control + (HDLC), etc. + + For mixed protocol environments, frames SHOULD be distributed between + all the different protocols. The distribution MAY approximate the + network conditions of deployment. In all cases, the details of the + mixed protocol distribution MUST be included in the reporting. + + Additionally, the DUT (Device Under Test) or SUT (System Under Test) + and test bed provisioning, port and line-card arrangement, + configuration, and deployed methodologies that may influence the + overall reset time MUST be listed. (Refer to the additional factors + listed in Section 3). + + The reporting of results MUST regard repeatability considerations + from Section 4 of [RFC2544]. It is RECOMMENDED to perform multiple + trials and report average results. + + + + +Asati, et al. Informational [Page 6] + +RFC 6201 Reset Characterization March 2011 + + +2. Key Words to Reflect Requirements + + The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT", + "SHOULD", "SHOULD NOT", "RECOMMENDED", "MAY", and "OPTIONAL" in this + document are to be interpreted as described in BCP 14, RFC 2119 + [RFC2119]. RFC 2119 defines the use of these key words to help make + the intent of Standards-Track documents as clear as possible. While + this document uses these keywords, this document is not a Standards- + Track document. + +3. Test Requirements + + Tests SHOULD first be performed such that the forwarding state + re-establishment is independent from an external source (i.e., using + static address resolution, routing and forwarding configuration, and + not dynamic protocols). However, tests MAY subsequently be performed + using dynamic protocols that the forwarding state depends on (e.g., + dynamic Interior Gateway Protocols (IGP), Address Resolution Protocol + (ARP), PPP Control Protocols, etc.). The considerations in this + section apply. + + In order to provide consistence and fairness while benchmarking a set + of different DUTs, the Network tester/operator MUST (a) use identical + control and data plane information during testing and (b) document + and report any factors that may influence the overall time after + reset/convergence. + + Some of these factors include the following: + + 1. Type of reset - hardware (line-card crash, etc.) versus software + (protocol reset, process crash, etc.) or even complete power + failures + + 2. Manual versus automatic reset + + 3. Scheduled versus non-scheduled reset + + 4. Local versus remote reset + + 5. Scale - Number of line cards present versus in use + + 6. Scale - Number of physical and logical interfaces + + 7. Scale - Number of routing protocol instances + + 8. Scale - Number of routing table entries + + 9. Scale - Number of route processors available + + + +Asati, et al. Informational [Page 7] + +RFC 6201 Reset Characterization March 2011 + + + 10. Performance - Redundancy strategy deployed for route processors + and line cards + + 11. Performance - Interface encapsulation as well as achievable + throughput [RFC2544] + + 12. Any other internal or external factor that may influence reset + time after a hardware or software reset + + The reset time is one of the key characterization results reported + after each test run. While the reset time during a reset test event + may be zero, there may still be effects on traffic, such as transient + delay variation or increased latency. However, that is not covered + and is deemed outside the scope of this document. In this case, only + "no loss" is reported. + +4. Reset Tests + + This section contains descriptions of the tests that are related to + the characterization of the time needed for DUTs (Devices Under Test) + or SUTs (Systems Under Test) to recover from a reset. There are + three types of resets considered in this document: + + 1. Hardware resets + + 2. Software resets + + 3. Power interruption + + Different types of resets potentially have a different impact on the + forwarding behavior of the device. As an example, a software reset + (of a routing process) might not result in forwarding interruption, + whereas a hardware reset (of a line card) most likely will. + + Section 4.1 describes various hardware resets, whereas Section 4.2 + describes various software resets. Additionally, Section 4.3 + describes power interruption tests. These sections define and + characterize these resets. + + Additionally, since device-specific implementations may vary for + hardware and software type resets, it is desirable to classify each + test case as "REQUIRED" or "OPTIONAL". + + + + + + + + + +Asati, et al. Informational [Page 8] + +RFC 6201 Reset Characterization March 2011 + + +4.1. Hardware Reset Tests + + A hardware reset test is a test designed to characterize the time it + takes a DUT to recover from a hardware reset. + + A hardware reset generally involves the re-initialization of one or + more physical components in the DUT, but not the entire DUT. + + A hardware reset is executed by the operator, for example, by + physical removal of a hardware component, by pressing a reset button + for the component, or by being triggered from the command line + interface (CLI). + + Reset procedures that do not require the physical removal and + insertion of a hardware component are RECOMMENDED. These include + using the command line interface (CLI) or a physical switch or + button. If such procedures cannot be performed (e.g., because of a + lack of platform support or because the corresponding test case calls + for them), human operation time SHOULD be minimized across different + platforms and test cases as much as possible, and variation in human + operator time SHOULD also be minimized across different vendors' + products as much as practical by having the same person perform the + operation and by practicing the operation. Additionally, the time + between removal and insertion SHOULD be recorded and reported. + + For routers that do not contain separate Routing Processor and Line + Card modules, the hardware reset tests are not performed since they + are not relevant; instead, the power interruption tests MUST be + performed (see Section 4.3) in these cases. + +4.1.1. Routing Processor (RP) / Routing Engine Reset + + The Routing Processor (RP) is the DUT module that is primarily + concerned with Control Plane functions. + +4.1.1.1. RP Reset for a Single-RP Device (REQUIRED) + + Objective + + To characterize the time needed for a DUT to recover from a Route + Processor hardware reset in a single RP environment. + + Procedure + + First, ensure that the RP is in a permanent state to which it will + return after the reset by performing some or all of the following + operational tasks: save the current DUT configuration, specify + + + + +Asati, et al. Informational [Page 9] + +RFC 6201 Reset Characterization March 2011 + + + boot parameters, ensure the appropriate software files are + available, or perform additional operating system or hardware- + related tasks. + + Second, ensure that the DUT is able to forward the traffic for at + least 15 seconds before any test activities are performed. The + traffic should use the minimum frame size possible on the media + used in the testing, and the rate should be sufficient for the DUT + to attain the maximum forwarding throughput. This enables a finer + granularity in the reset time measurement. + + Third, perform the Route Processor (RP) hardware reset at this + point. This entails, for example, physically removing the RP to + later re-insert it or triggering a hardware reset by other means + (e.g., command line interface, physical switch, etc.). + + Finally, complete the characterization by recording the frame loss + or timestamps (as reported by the test tool) and calculating the + reset time (as defined in Section 1.3). + + Reporting Format + + The reporting format is defined in Section 1.4. + +4.1.1.2. RP Switchover for a Multiple-RP Device (OPTIONAL) + + Objective + + To characterize the time needed for the "secondary" Route + Processor (sometimes referred to as the "backup" RP) of a DUT to + become active after a "primary" (or "active") Route Processor + hardware reset. This process is often referred to as "RP + Switchover". The characterization in this test should be done for + the default DUT behavior and, if it exists, for the DUT's non- + default configuration that minimizes frame loss. + + Procedure + + This test characterizes RP Switchover. Many implementations allow + for optimized switchover capabilities that minimize the downtime + during the actual switchover. This test consists of two sub-cases + from a switchover characteristic's standpoint: first, a default + behavior (with no switchover-specific configurations) and, + potentially second, a non-default behavior with switchover + configuration to minimize frame loss. Therefore, the procedures + hereby described are executed twice and reported separately. + + + + + +Asati, et al. Informational [Page 10] + +RFC 6201 Reset Characterization March 2011 + + + First, ensure that the RPs are in a permanent state such that the + secondary RP will be activated to the same state as the active RP + by performing some or all of the following operational tasks: save + the current DUT configuration, specify boot parameters, ensure the + appropriate software files are available, or perform additional + operating system or hardware-related tasks. + + Second, ensure that the DUT is able to forward the traffic for at + least 15 seconds before any test activities are performed. The + traffic should use the minimum frame size possible on the media + used in the testing, and the rate should be sufficient for the DUT + to attain the maximum forwarding throughput. This enables a finer + granularity in the reset time measurement. + + Third, perform the primary Route Processor (RP) hardware reset at + this point. This entails, for example, physically removing the RP + or triggering a hardware reset by other means (e.g., command line + interface, physical switch, etc.). It is up to the operator to + decide whether or not the primary RP needs to be re-inserted after + a grace period. + + Finally, complete the characterization by recording the frame loss + or timestamps (as reported by the test tool) and calculating the + reset time (as defined in Section 1.3). + + Reporting Format + + The reset results are potentially reported twice, one for the + default switchover behavior (i.e., the DUT without any switchover- + specific enhanced configuration) and the other for the switchover- + specific behavior if it exists (i.e., the DUT configured for + optimized switchover capabilities that minimize the downtime + during the actual switchover). + + The reporting format is defined in Section 1.4 and also includes + any specific redundancy scheme in place. + +4.1.2. Line Card (LC) Removal and Insertion (REQUIRED) + + The Line Card (LC) is the DUT component that is responsible for + packet forwarding. + + Objective + + To characterize the time needed for a DUT to recover from a line- + card removal and insertion event. + + + + + +Asati, et al. Informational [Page 11] + +RFC 6201 Reset Characterization March 2011 + + + Procedure + + For this test, the line card that is being hardware-reset MUST be + on the forwarding path, and all destinations MUST be directly + connected. + + First, complete some or all of the following operational tasks: + save the current DUT configuration, specify boot parameters, + ensure the appropriate software files are available, or perform + additional operating system or hardware-related tasks. + + Second, ensure that the DUT is able to forward the traffic for at + least 15 seconds before any test activities are performed. The + traffic should use the minimum frame size possible on the media + used in the testing, and the rate should be sufficient for the DUT + to attain the maximum forwarding throughput. This enables a finer + granularity in the reset time measurement. + + Third, perform the Line Card (LC) hardware reset at this point. + This entails, for example, physically removing the LC to later re- + insert it or triggering a hardware reset by other means (e.g., + CLI, physical switch, etc.). + + Finally, complete the characterization by recording the frame loss + or timestamps (as reported by the test tool) and calculating the + reset time (as defined in Section 1.3). + + Reporting Format + + The reporting format is defined in Section 1.4. + +4.2. Software Reset Tests + + A software reset test characterizes the time needed for a DUT to + recover from a software reset. + + In contrast to a hardware reset, a software reset involves only the + re-initialization of the execution, data structures, and partial + state within the software running on the DUT module(s). + + A software reset is initiated, for example, from the DUT's CLI. + +4.2.1. Operating System (OS) Reset (REQUIRED) + + Objective + + To characterize the time needed for a DUT to recover from an + operating system (OS) software reset. + + + +Asati, et al. Informational [Page 12] + +RFC 6201 Reset Characterization March 2011 + + + Procedure + + First, complete some or all of the following operational tasks: + save the current DUT configuration, specify software boot + parameters, ensure the appropriate software files are available, + or perform additional operating system tasks. + + Second, ensure that the DUT is able to forward the traffic for at + least 15 seconds before any test activities are performed. The + traffic should use the minimum frame size possible on the media + used in the testing, and the rate should be sufficient for the DUT + to attain the maximum forwarding throughput. This enables a finer + granularity in the reset time measurement. + + Third, trigger an operating system re-initialization in the DUT by + operational means such as use of the DUT's CLI or other management + interface. + + Finally, complete the characterization by recording the frame loss + or timestamps (as reported by the test tool) and calculating the + reset time (as defined in Section 1.3). + + Reporting Format + + The reporting format is defined in Section 1.4. + +4.2.2. Process Reset (OPTIONAL) + + Objective + + To characterize the time needed for a DUT to recover from a + software process reset. + + Such a time period may depend upon the number and types of + processes running in the DUT and which ones are tested. Different + implementations of forwarding devices include various common + processes. A process reset should be performed only in the + processes most relevant to the tester and most impactful to + forwarding. + + Procedure + + First, complete some or all of the following operational tasks: + save the current DUT configuration, specify software parameters or + environmental variables, or perform additional operating system + tasks. + + + + + +Asati, et al. Informational [Page 13] + +RFC 6201 Reset Characterization March 2011 + + + Second, ensure that the DUT is able to forward the traffic for at + least 15 seconds before any test activities are performed. The + traffic should use the minimum frame size possible on the media + used in the testing, and the rate should be sufficient for the DUT + to attain the maximum forwarding throughput. This enables a finer + granularity in the reset time measurement. + + Third, trigger a process reset for each process running in the DUT + and considered for testing from a management interface (e.g., by + means of the CLI, etc.). + + Finally, complete the characterization by recording the frame loss + or timestamps (as reported by the test tool) and calculating the + reset time (as defined in Section 1.3). + + Reporting Format + + The reporting format is defined in Section 1.4 and is used for + each process running in the DUT and tested. Given the + implementation nature of this test, details of the actual process + tested should be included along with the statement. + +4.3. Power Interruption Test + + "Power interruption" refers to the complete loss of power on the DUT. + It can be viewed as a special case of a hardware reset, triggered by + the loss of the power supply to the DUT or its components, and is + characterized by the re-initialization of all hardware and software + in the DUT. + +4.3.1. Power Interruption (REQUIRED) + + Objective + + To characterize the time needed for a DUT to recover from a + complete loss of electric power or complete power interruption. + This test simulates a complete power failure or outage and should + be indicative of the DUT/SUT's behavior during such event. + + Procedure + + First, ensure that the entire DUT is at a permanent state to which + it will return after the power interruption by performing some or + all of the following operational tasks: save the current DUT + configuration, specify boot parameters, ensure the appropriate + software files are available, or perform additional operating + system or hardware-related tasks. + + + + +Asati, et al. Informational [Page 14] + +RFC 6201 Reset Characterization March 2011 + + + Second, ensure that the DUT is able to forward the traffic for at + least 15 seconds before any test activities are performed. The + traffic should use the minimum frame size possible on the media + used in the testing, and the rate should be sufficient for the DUT + to attain the maximum forwarding throughput. This enables a finer + granularity in the reset time measurement. + + Third, interrupt the power (AC or DC) that feeds the corresponding + DUT's power supplies at this point. This entails, for example, + physically removing the power supplies in the DUT to later re- + insert them or simply disconnecting or switching off their power + feeds (AC or DC, as applicable). The actual power interruption + should last at least 15 seconds. + + Finally, complete the characterization by recording the frame loss + or timestamps (as reported by the test tool) and calculating the + reset time (as defined in Section 1.3). + + For easier comparison with other testing, 15 seconds are removed + from the reported reset time. + + Reporting Format + + The reporting format is defined in Section 1.4. + +5. Security Considerations + + Benchmarking activities, as described in this document, are limited + to technology characterization using controlled stimuli in a + laboratory environment, with dedicated address space and the + constraints specified in the sections above. + + The benchmarking network topology will be an independent test setup + and MUST NOT be connected to devices that may forward the test + traffic into a production network or misroute traffic to the test + management network. + + Furthermore, benchmarking is performed on a "black-box" basis, + relying solely on measurements observable externally to the DUT/SUT. + + Special capabilities SHOULD NOT exist in the DUT/SUT specifically for + benchmarking purposes. Any implications for network security arising + from the DUT/SUT SHOULD be identical in the lab and in production + networks. + + There are no specific security considerations within the scope of + this document. + + + + +Asati, et al. Informational [Page 15] + +RFC 6201 Reset Characterization March 2011 + + +6. Acknowledgments + + The authors would like to thank Ron Bonica, who motivated us to write + this document. The authors would also like to thank Al Morton, + Andrew Yourtchenko, David Newman, John E. Dawson, Timmons C. Player, + Jan Novak, Steve Maxwell, Ilya Varlashkin, and Sarah Banks for + providing thorough review, useful suggestions, and valuable input. + +7. References + +7.1. Normative References + + [RFC1242] Bradner, S., "Benchmarking Terminology for Network + Interconnection Devices", RFC 1242, July 1991. + + [RFC2119] Bradner, S., "Key words for use in RFCs to Indicate + Requirement Levels", BCP 14, RFC 2119, March 1997. + + [RFC2544] Bradner, S. and J. McQuaid, "Benchmarking Methodology for + Network Interconnect Devices", RFC 2544, March 1999. + +7.2. Informative References + + [IGPConv] Poretsky, S., Imhoff, B., and K. Michielsen, "Benchmarking + Methodology for Link-State IGP Data Plane Route + Convergence", Work in Progress, February 2011. + + [RFC5180] Popoviciu, C., Hamza, A., Van de Velde, G., and D. + Dugatkin, "IPv6 Benchmarking Methodology for Network + Interconnect Devices", RFC 5180, May 2008. + + [RFC5695] Akhter, A., Asati, R., and C. Pignataro, "MPLS Forwarding + Benchmarking Methodology for IP Flows", RFC 5695, November + 2009. + + + + + + + + + + + + + + + + + +Asati, et al. Informational [Page 16] + +RFC 6201 Reset Characterization March 2011 + + +Authors' Addresses + + Rajiv Asati + Cisco Systems + 7025-6 Kit Creek Road + Research Triangle Park, NC 27709 + USA + + EMail: rajiva@cisco.com + + + Carlos Pignataro + Cisco Systems + 7200-12 Kit Creek Road + Research Triangle Park, NC 27709 + USA + + EMail: cpignata@cisco.com + + + Fernando Calabria + Cisco Systems + 7200-12 Kit Creek Road + Research Triangle Park, NC 27709 + USA + + EMail: fcalabri@cisco.com + + + Cesar Olvera Morales + Consulintel + Joaquin Turina, 2 + Pozuelo de Alarcon, Madrid, E-28224 + Spain + + EMail: cesar.olvera@consulintel.es + + + + + + + + + + + + + + + +Asati, et al. Informational [Page 17] + |